Jordan River Trail Millcreek Layout
Jordan River Trail Millcreek
Plans to develop a new section of the Jordan River Trail in Millcreek that includes a new 12-foot-wide asphalt multipurpose trail approximately 825 lineal feet in length along with a 120-foot-long bridge and its abutments that will connect to the Jordan River Trail in Taylorsville. Also, a new connector trail, approximately 590 lineal feet and 12-feet wide will be developed and connect 4060 South to the main trail along with landscape restoration work along the trail corridor.
The project is scheduled for completion June 2024.