Restored riparian zone and rebuilt floodplain at roughly 4500S (at Murray Public Works), completed in summer 2022. Weed mitigation to prepare the riparian area for revegetation with native plants began in 2020.
Restored riparian zone and rebuilt floodplain at roughly 4500S (at Murray Public Works), completed in summer 2022. Weed mitigation to prepare the riparian area for revegetation with native plants began in 2020.
Photo station installed fall 2017